CLUNE BUILDING

Services for brands building stores across Minnesota

Six services, from the first site walk to the warranty walk 11 months after opening. Most programs use all of them; you can also hire us for a single stage.

01

Site surveys and due diligence

Walk-through of each candidate space before you sign the lease: existing conditions, electrical service size, water and gas capacity, HVAC age, storefront and ADA path of travel. You get a written report with photos and an adder estimate in 5 business days.

02

Prototype preconstruction

Estimate, value engineering, constructability review and schedule for your first Minnesota store, working with your architect. The output is a GMP for the prototype and the unit price schedule used for every site after it.

03

Store buildouts

Interior buildouts in shell and second-generation retail space: demolition, framing, drywall, ceilings, millwork, flooring, storefront, and licensed electrical, plumbing and HVAC subcontractors.

04

Reimage and remodel programs

Brand refreshes across existing stores: new finishes, signage coordination, fixtures and lighting, often phased at night or over short closures so stores reopen on a set date.

05

Pad-site new builds

Single-story freestanding buildings on outlot and pad sites, typically 2,000 to 6,000 SF, including foundations, structure, envelope, site utilities coordination and drive-thru lanes.

06

Closeout and warranty

Punch list, as-builts, O&M manuals, final lien waivers, and a one-year warranty with an 11-month warranty walk at every store.

Contracts and pricing

The prototype is built cost plus fee with a guaranteed maximum price, so you see the real cost of your store in Minnesota. Following stores are stipulated sum contracts on AIA A101-2017 with A201-2017 general conditions, priced from the schedule.

Billing is monthly on AIA G702 / G703 against a schedule of values, with 5% retainage and lien waivers each period. Quotes are valid for 60 days; Minneapolis construction costs rose 2.86% in a single quarter in the Mortenson Q3 2026 cost index, so older quotes are re-confirmed before signing.

Typical pricing ranges
ItemTypical priceNotes
Site survey and report$1,450 per siteCredited to the contract if we build the site
Prototype preconstruction$8,500 flatEstimate, VE, schedule, GMP and price schedule
Interior buildout$95–160 / SFSecond-generation or shell space, by finish level
Reimage / remodel$45–110 / SFFinishes, lighting, fixtures; no structural work
Pad-site new build$230–340 / SFBuilding only; sitework priced per site
Contractor fee5% of cost of workGeneral conditions typically 7–10%

Ranges are hard costs for Twin Cities and Greater Minnesota work in 2026 and exclude design fees, permits, equipment you supply and sales tax. Your site prices come from the survey and prototype GMP.

Four stages at every site

  1. 01 Preconstruction

    Survey, scope from the prototype, site adders, schedule against your opening date.

  2. 02 Buyout and permitting

    Subcontracts awarded, long-lead items ordered, permit submitted to the city under the 2020 Minnesota State Building Code and 2024 Minnesota Commercial Energy Code.

  3. 03 Construction

    Weekly OAC meeting and report, RFIs and submittals tracked, change orders priced and approved before the work.

  4. 04 Closeout

    Substantial completion, punch list, closeout binder, final lien waivers, then release of retainage.

Illustrative product interface

What we do not take on

We do not build single-family or 1–4 unit residential work, industrial plants or warehouses, or multi-story buildings. Keeping to retail-scale commercial work is what lets us price stores consistently.